Installation Instructions

4. Installation Procedures
136
WiBAS-Connect and Panel, Continued
Procedure for
VERTICAL
antenna
orientation,
continued
Step
Action
2b
Pass through both clamps to pole bracket openings and then
install the whole assembly onto the pole (taking into the
account the caution below):
Do not over tighten the warm screws. Adjust the tool for
applying min / max tightening torque 5.5 / 7 Nm.
Continued on next page