Installation Instructions

WiBAS / WiBAS G5 Terminal Stations
Installation & Cabling Manual - Edition 2.1
185
PONE-OD67-AC, Continued
Procedure,
continued
Step
Action
2
Pass the cable through the parts of gland, as shown below.
Plug the Ethernet cables to the GbE receptacles (OUT: goes to
radio and IN: goes to customer network). Listen for a “click”
when inserting. This verifies that the jack has been inserted
properly.
3
Perform the following actions:
Insert the claw to body taking in consideration the caution
below (A).
Insert the seal to claw (B).
Use the adjustable torque U-wrench to screw the sealing nut
to body (C).
Do not over tighten. Adjust the tool for tightening torque
2 Nm (the final torque will be applied to the next step).
Continued on next page