Installation Instructions

WiBAS / WiBAS G5 Terminal Stations
Installation & Cabling Manual - Edition 2.1
187
PONE-OD67-AC, Continued
Procedure,
continued
Step
Action
5
Install the grounding cable as shown below.
Do not over tighten. Adjust the tool with M5 deep socket
for maximum tightening torque 3 Nm.
6
Install the power cable as shown below.
7
For wall installation perform the following actions:
Position the device on the wall surface and using a pencil
mark the drill points. With the drill machine (fitted with 5 mm
bit), drill four holes on the wall surface, at a depth of 45 mm.
Install the 2 supplied wall plugs and using the cross headed
screwdriver tighten the 2 screws.
End of procedure.