Safety Precautions, Continued
Working on the Building’s Roof
During stormy weather, do not perform any mechanical assembling
or antenna installation / alignment works on the building’s roof.
The metal structure of towers / masts is prone to lightning.
Proper Grounding Installation
Never power on any equipment unless you have completed the
grounding installation.
There is risk of equipment failure and / or electrical shock. Ensure that:
The grounding system measures an appropriate path resistance as
specified by local regulations.
An appropriate grounding bar (or terminal) exists at the proximity of each
equipment installation position.
The equipment is intended to be installed in location only where the
equipotential bonding has been applied.
ESD Protection
When using SFP, then the product is a Class 1 laser product.
Equipment Access
Only trained, authorized personnel should have access to the installed
equipment.
Hot Surfaces
Do not touch the outer surface of the equipment during operation without
proper personal protection.
Allow unit to cool (after switch off) before servicing.