Installation Instructions

3. Before Starting the Installation
58
3.3. Site Prerequisites
Site survey
Site survey should be done before start the installation taking in
consideration the following:
Premises information
Site details (address, contact persons, GPS and/or map co-ordinates,
etc.).
Site access and storage information (means of transport, equipment
storage and lifting information, etc.).
Site location maps.
Network planning
Site Coordinates.
LOS verification (between WiBAS
TM
Base stations and WiBAS
TM
Terminal
stations).
Rooftop information (height, status, access, dimensions, layout, etc.).
Information about pre-existing indoor/ outdoor equipment.
Available mounting space (on the buildings’ roofs) to reserve for the
installation of the outdoor equipment.
Site-specific information
Mechanical specifications of masts/ towers (type, dimensions/ diameter,
material, exterior finishing, etc.).
Location of appropriate grounding points (bar or terminals).
Location of appropriate power supply distribution points.
Location of cable conduits available for routing the cables.
Location of the network port distributors.
Total length of the cables required.
Preparation of
the installation
premises
Access to the installation premises must be facilitated during the
installation period.
Entrances must be large enough to enable the easy transportation of the
new equipment.
The floor must be level, smooth and able to bear the load of the
equipment.
The roof must be engineered to bear the weight of the service personnel
and the outdoor equipment.
Continued on next page