Installation Instructions
WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
235
PONE-OD-DC, Continued
Prerequisites
Prepare and terminate the ETH SF/UTP and grounding cables as described
in Appendix B – Terminating Cables.
Prepare and terminate the power supply cable as described in the following
procedure.
Tools and
materials
Tools
Adjustable torque wrench tool with TORX bit and screwdrivers
(refer to Equipment installation tools) and drill machine (refer
to Specific works).
Cable cutter and blade (see Termination of cables)
Materials
INST-PONE-PL.
PONE-OD-DC.
Continued on next page