Installation Instructions

WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
253
Ethernet (SF/UTP), Continued
Procedure,
continued
Step
Action
7
With the pliers, bring the terminal of the connector back, over
the exposed shield, and press gently around the terminal to
form. This will achieve good contact with the shield.
For termination type A:
For termination type B:
8
Use the Ethernet cable tester to verify the proper cable
termination.
End of procedure.