Installation Instructions

3. Before Starting the Installation
40
WiBAS G5 dual-BS
Receptacles
#
Marking
Details
Use
A
GbE#1
Ethernet, electrical
R-J45 (100/1000 Base-T).
To connect a Gigabit Ethernet
(SF/UTP) cable for traffic / inband
management / superimposed DC
power (POE input).
B
GbE#2
SFP1 cage.
To connect a Fiber optic cable for
traffic.
C
GbE#3
SFP2 cage.
D
GbE#4
SFP3 cage.
Reserved for future use.
E
USB
Type A USB interface.
Engineering port.
F
PSU
Powering of the unit /
connection to a -48 V DC
power supply.
To connect DC power connector.
There is polarity
concern. Please refer to
DC-PWR-CAB-3 cable
termination overview for
WiBAS G5 dual-BS
Continued on next page