Installation Instructions
3. Before Starting the Installation
42
WiBAS G5 dual-BS, Continued
Other points
#
Marking
Details
Use
A
GRD
Enclosure grounding
terminal.
To connect M5 grounding lug.
B
STAT
Multi-functioning LED.
To provide visual indication of
system status during operation.
C
-
M4 screws.
To install cable holder.
D
-
Hooks.
To attach radio unit onto the
antenna.
E
-
Handle.
To carry radio unit.
F
-
Wave guide port.
To connect antenna feeder.