User's Manual Part 1

da Vinci
®
Si™
Introduction
1-17
DRAFT/PRE-RELEASE/CONFIDENTIAL
10/9/14
Table 2: Manufacturer’s Declaration – Electromagnetic Immunity
The IS3000 is intended for use in the electromagnetic environment specified below. The customer or the user
of the IS3000 should assure that it is used in such an environment.
Immunity Test IEC 60601 Test Level Compliance Level
Electromagnetic
Envir
onment Guidance
Electrostatic discharge
(ESD) IEC 61
000-4-2
±6 kV contact ±8 kV air ±6 kV contact ±8 kV air Floors should be wood,
concrete or ceramic tile. If
floors are covered with
synthetic material, the
relative humidity should
be at least 30%.
Electrical fast
transient/burst IEC
61000-4-4
±2 kV for power supply
lines ±1 kV for input/
output lines
±2 kV for power supply
lines ±1 kV for input/
output lines
Mains power quality
should be that of a US
commercial or hospital
environment with highly
reliable service.
Surge IEC 61000-4-5
±1 kV differential mode ±2
kV common mode
±1 kV differential mode ±2
kV common mode
Mains power quality
should be that of a US
commercial or hospital
environment with highly
reliable service.
Voltage dips, short
interruptions and voltage
variations on power supply
input lines IEC 61000-4-11
<5% UT (>95% dip in UT)
for 0.5 cycle 40% UT (60%
dip in UT) for 5 cycles 70%
UT (30% dip in UT) for 25
cycles <5% UT (>95% dip
in UT) for 5 sec.
<5% UT (>95% dip in UT)
for 0.5 cycle 40% UT (60%
dip in UT) for 5 cycles 70%
UT (30% dip in UT) for 25
cycles <5% UT (>95% dip
in UT) for 5 sec.
Mains power quality
should be that of a US
commercial or hospital
environment with highly
reliable service. If the user
of the IS3000 requires
continued operation
during power mains
interruptions, it is
recommended that the
IS3000 be powered from
an uninterruptible power
supply.
Power frequency (50/60
Hz) magnetic field IEC
61000-4-8
3 A/m 3 A/m Power frequency
magnetic fields should be
at levels characteristic of a
typical location in a typical
commercial or hospital
environment.
Note: UT is the AC mains voltage before application of the test level.