Product Manual

Part No 1160803 5 Floor Base and Fixed Trapeze
Installing/Adjusting the Grab Bar
WARNING
DO NOT INSTALL OR ADJUST TRAPEZE OF AN OCCUPIED BED.
NOTE:Forthisprocedure,refertoFIGURE 2onpage4.
Installing the Grab Bar onto the Offset Bar
1. Loosenthetrapezekeybyturningitcounterclockwise.
2. Slidetheclamptodesiredpositionontheoffsetbar.
3. Securethetrapezeclamptotheoffsetbarbyturningthekeyclockwiseuntilitis
secure.
Adjusting Grab Bar Height
PositionanyofthelowerchainlinksontotheʺSʺhooktoachievethedesiredheightoff
thesurfaceofthebed.
NOTE:Makesurethatthechainlinkiscompletelyseatedonthe“S”hook.
Storing the Floor Base
NOTE:Forthisprocedure,refertoFIGURE 3.
1. Removethetrapezefromthefloorbase.
2. Depressonesnapbuttononfloorlegassemblyandliftuponth e ʺAʺframeuntilthesnap
buttonclearsthetopofthefloorlegasse mbly.
3. Rotateonelegofthefloorbaseasse mbly 270°clockwiseaw ayfromtheotherleg.
4. Rotatetheremaininglegofthefloorbaseassembly90°clockwisetowardstheotherleg.
FIGURE 3 Storing the Floor Base
Snap
Button
Floor Base
Assembly
STEP 4
“A” Frame
Floor Base
Assembly
STEP 3