Installation Guide
Table Of Contents
- 1 Introduction
- 2 Safety & Compliance Information
- 3 Safely Accessing a Fuel Pump
- 4 Read the Manual
- 5 Follow the Regulations
- 6 Replacement Parts
- 7 Safety Symbols and Warning Words
- 8 Prevent Explosions and Fires
- 9 Working Alone
- 10 Safety First: Working with Electricity
- 11 Hazardous Materials
- 12 Informing Emergency Personnel
- 13 Computer Programs and Documentation
- 14 Approvals
- 15 Product Features
- 16 Accessories in the box
- 17 Location of Mounting Points
- 18 Installation
- 19 Tools Required to Mount the G6-300
- 20 Installing Into a New Pump or Cabinet
- 21 Upgrading an Existing Invenco Outdoor Payment Terminal
- 22 Power Supply Considerations
- 23 Wiring
- 24 Protective Earth
- 25 Ethernet LAN
- 26 DC Power Supply
- 27 Main Power Supply Wiring
- 28 Wiring Completion
- 29 First Power-Up
- 30 Standard Screens
- 31 Basic Maintenance
- 32 How to Load Paper
- 33 Clearing a Paper Jam
- 34 Security Checks
- 35 Inspection
- 36 Escalation
- 37 Removal & Reinstallation
- 38 Drawings
- 39 Mounting – New Installation
- 40 Typical Wiring
- 41 Release History
CHAPTER 5
Follow the Regulations
Regulations exist to keep everyone safe.
You are expected to follow:
• OSH regulations.
• National regulations and codes.
• State regulations and codes.
• Local regulations and codes.
Note: If you do not install, inspect, maintain or service this equipment in accordance with these codes,
regulations and standards, it may affect the safe use and operation of the equipment, or lead to legal
citations with penalties.
DCV-00477 S2 R03 5