Installation Instructions

For technical assistance call
2
NA / LATAM // 704.752.6513
888.55.INVUE
EMEA // +31.23.8900150
APAC // +852.3127.6811
Wireless Zone Manager DBD702 & Optional LED Emitter DBD703
9
6
Connect the power cable to
the power supply and plug
the power cable into a power
outlet.
8
Place the Zone Manager
where desired and apply
pressure for at least 10
seconds.
Once it is determined how
and where the Zone Manager
will be mounted, introduce a
sensor and device (following
the steps outlined in the sensor
instructions) to the alarm zone
to test the settings. Adjust the
setting as desired.
(meters)
3
2
1
0
7
If mounting with the
adhesives, peel the clear lm
from the 4 adhesives.
10
The LED will illuminate gold.
Note: if at any time the LED
ashes yellow instead of
remaining constant, this
indicates that the Zone
Manager has lost power is
running off of the battery.
5a
Determine how the Zone Manager
will be mounted.
• If using the adhesives, clean
the area where the Zone
Manager will be mounted.
• If mounting to a wall using
the 8mm screw holes, the
holes are set 8 15/16 inches
(225 mm) apart center to
center.
5b
If threading hardware into the
M4 x 0.7 threaded inserts on
the Zone Manager to install
it suspended or against a
horizontal surface (ceiling,
underside of a table, etc.), ensure
that some type of threadlocker
(i.e. Loctite Threadlocker Blue) is
used. This will prevent loosening
through any vibrations.
11
If using the optional LED
Emitter, determine where
it will be mounted. Ensure
that it will be visible. Use
the provided alcohol wipe
to clean the area where it
will be mounted.