Installation guide

24
25
Using a cascading cable, connect the available CPU port on the upper level GCS1716, to the console 3.
port on the lower level GCS1716. Refer to the diagram on page 27.
Repeat the above step #3 for any additional switches you wish to add by connecting the second unit 4.
to another available CPU port on the rst GCS1716.
The Power On sequence requires that all second stage units be powered on rst. After they are all on, 5.
the rst stage units must be powered on next. Only after all the switches have been powered on in this
sequence, can the computers be powered on.