Installation Instructions

Table Of Contents
nano3G AP Installation Manual Installation Overview and Requirements
N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011 Page 14
2.4.2 nano3G S8 AP Physical Requirements
A nano3G S8 AP may be installed in one of the following ways (see section 6.3.4):
Free-standing on a flat stable surface.
Attached to a wall or partition using two screws that engage in keyhole slots in the
rear surface of the AP.
Attached to a POE splitter using the two screws that engage in keyhole slots in the
rear surface of the AP. The POE splitter in turn attaches to a wall or partition using
two screws.
The unit must be vertical to ensure that air can circulate freely around it.
It is recommended to install the AP with its front surface facing the area requiring cellular
coverage, unobstructed by walls or partitions that may have significant RF attenuation.
2.4.3 nano3G S8 AP IP Bandwidth Requirements
At maximum capacity, a nano3G S8 AP will require:
Downlink: at least 7Mbps
Uplink: at least 1Mbps
This will deliver up to 8 voice calls and HSDPA services up to 7.2 Mbps.
2.4.4 nano3G S8 AP Sundry Installation Equipment
To mount the POE splitter or the nano3G S8 AP onto the wall:
2 self tapping pan head screws, size No. 6 (approx 3.5mm (0.14in) in
diameter)
Wall plugs if required
Suitable drills and screwdriver
Dimensions and
weight
Height 176mm (without stand)
193mm (with stand)
Width 170mm
Depth 51mm
Approximate Weight 0.42 kg (AP only)
Environmental Cooling Vents on the back at top and bottom
Operating Temperature 0°C to 40°C
Operating Humidity 10 to 70% non-condensing