nano3G AP Installation Manual Commission a nano3G AP
N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011 Page 36
5.4 Optional Download Activities
If it is necessary to download a software or ATAS package to the AP, this must be done 
before configuring the connection to the AP Management System. This is because the web 
pages that provide the download options will not be available once the connection 
commissioning activities are complete.
This can only be done if the commissioning terminal is running a web server that provides a 
path to any ip.access AP software download packages. That is, the required .sdp files must 
be present on the commissioning terminal.
Setting up a web server for this purpose on the commissioning terminal is outside the scope 
of this manual.
5.4.1 Optional - Software Download
Use the SW Download page to download a different version of AP software to the AP from 
the commissioning terminal. Then switch banks to the new software version, which restarts 
the AP. 
4) Click the SW Download link on the left. The web page for downloading software 
will be shown. This also provides details about the current software installed on the 
AP. 
5) In the text box, enter the URL for the SPD file stored on the commissioning 
terminal. For example, the URL of a software file for a nano3G E8 AP might be: 
http://192.168.0.2/webservername/220H007_<ver>.spd
Where <ver> is the actual build version of the required software package.
6) Click Begin Download. 
7) Wait about a minute for the download to take place.