Installation Instructions
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
 - 1 Introduction
 - 2 Installation Overview and Requirements
 - 3 Pre-Provisioning a nano3G AP
 - 4 Configuration File Preparation
 - 5 Commission a nano3G AP
 - 6 nano3G AP Hardware Installation
 - 7 Finalize Installation
 - 8 Troubleshooting
 - 9 nano3G AP and PSU Regulatory Information
 
 
nano3G AP Installation Manual Commission a nano3G AP
N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011 Page 39
5.5.2 Configure the AP Management System Connection
22) If a secure connection is required, select IPSec Enabled. Also enter the address 
for the IPSec Gateway and the Traffic Selector address and subnet mask.
23) Enter addresses for the AP Management System, a suitable CRL server and the 
NTP server.
24) To save the configuration, click Apply Changes.
Note: At this point it may be useful to make a separate note of the parameter 
values entered in this screen. Alternatively, save a screenshot of the web 
page (information about how to take a screenshot is outside the scope of 
this manual).
5.5.3 Complete the AP Commissioning
25) Click the Connection Config link on the left, to ensure the correct page is 
showing.
26) To start the AP in normal operation mode, click Complete Commissioning.
27) Acknowledge the warning about changes in the IP configuration and click OK.
28) When the initial configuration is complete, power off the AP and disconnect it from 
the commissioning terminal. 
At this point, the commissioning web page is no longer accessible. If there are 
configuration errors that prevent the AP connecting to its serving AP Management 
System, the commissioning procedure must be started again after resetting the AP 
with a factory reset. See section 8.2 for factory reset instructions. 