Installation Instructions
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
 - 1 Introduction
 - 2 Installation Overview and Requirements
 - 3 Pre-Provisioning a nano3G AP
 - 4 Configuration File Preparation
 - 5 Commission a nano3G AP
 - 6 nano3G AP Hardware Installation
 - 7 Finalize Installation
 - 8 Troubleshooting
 - 9 nano3G AP and PSU Regulatory Information
 
 
nano3G AP Installation Manual Finalize Installation
N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011 Page 65
7.3 Bring the AP into Service
Once the AP has the latest software image and configuration is complete, it is ready for 
service.
1) To bring the AP into service, right-click the 3G AP object in the OMC-R Client and 
select Unlock. The padlock symbol next to the 3G AP icon will be removed.
2) If the installation engineer is still on site, the engineer should make CS and PS test 
calls to verify the AP is providing service. 










