User's Manual
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
- 1 Introduction
- 2 Installation Overview and Requirements
- 2.1 Installation Tasks
- 2.2 Requirements for All nano3G APs
- 2.2.1 General Requirements
- 2.2.2 nano3G AP Cooling
- 2.2.3 Information Required for Pre-Provisioning
- 2.2.4 Parameters for Enterprise Deployments
- 2.2.5 Parameters for Residential Deployments
- 2.2.6 Access Control
- 2.2.7 Closed Access with CSG Parameter Broadcast
- 2.2.8 Closed Access in Legacy Mode
- 2.2.9 Pre-Prepared Configurations - Optional
- 2.2.10 Information Required for Commissioning
- 2.2.11 Other Items for Commissioning
- 2.3 nano3G S8 AP Site Requirements
- 2.4 nano3G S16 AP Site Requirements
- 2.5 nano3G E8 AP and nano3G E16 AP Site Requirements
- 3 Pre-Provisioning a nano3G AP
- 4 Configuration File Preparation
- 5 Commission a nano3G AP
- 6 nano3G AP Hardware Installation
- 7 Finalize Installation
- 8 Troubleshooting
- 9 nano3G AP and PSU Regulatory Information
nano3G AP Installation Manual Pre-Provisioning a nano3G AP
N3G_INST_300 v292_1.0 for N3G_2.92 © ip.access Limited 2012 Page 42
3.3 Apply an Attribute Configuration to the AP
This is optional. This could be done if, for example:
• No AP configuration file or template was used as the basis for the AP’s initial
configuration
• There is a requirement to load multiple configuration files and/or templates, in
addition to any file and/or template already loaded in the Create Site Wizard
3.3.1 Load a Configuration File for the AP
For information on preparing a configuration file for an AP, see section 4.
1) Ensure the configuration file is available on the NOS Server or the computer
running the NOS Client.
2) If not already logged in, log in to the NOS Client with a user name that has Full
Access to the AP.
3) To start the NOS Load Attributes Wizard, right-click on the AP object in the NOS
Client and then select Load Attributes From File.