User's Manual
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
- 1 Introduction
- 2 Installation Overview and Requirements
- 2.1 Installation Tasks
- 2.2 Requirements for All nano3G APs
- 2.2.1 General Requirements
- 2.2.2 nano3G AP Cooling
- 2.2.3 Information Required for Pre-Provisioning
- 2.2.4 Parameters for Enterprise Deployments
- 2.2.5 Parameters for Residential Deployments
- 2.2.6 Access Control
- 2.2.7 Closed Access with CSG Parameter Broadcast
- 2.2.8 Closed Access in Legacy Mode
- 2.2.9 Pre-Prepared Configurations - Optional
- 2.2.10 Information Required for Commissioning
- 2.2.11 Other Items for Commissioning
- 2.3 nano3G S8 AP Site Requirements
- 2.4 nano3G S16 AP Site Requirements
- 2.5 nano3G E8 AP and nano3G E16 AP Site Requirements
- 3 Pre-Provisioning a nano3G AP
- 4 Configuration File Preparation
- 5 Commission a nano3G AP
- 6 nano3G AP Hardware Installation
- 7 Finalize Installation
- 8 Troubleshooting
- 9 nano3G AP and PSU Regulatory Information
nano3G AP Installation Manual Commission a nano3G AP
N3G_INST_300 v292_1.0 for N3G_2.92 © ip.access Limited 2012 Page 55
15) Click the ATAS Download link on the left. The web page for downloading an ATAS
bundle will be shown. This will also show any current ATAS version information, if
applicable.
16) Inspect the current ATAS version information. If the ATAS package is already
correct then it is not necessary to re-download the ATAS package, so skip to
section 5.5.
17) In the text box, enter the URL for the SDP file stored on the commissioning
terminal, which contains the required ATAS bundle. For example:
http://192.168.0.2/webservername/atas_file.sdp
18) Click Begin Download.
19) Wait about a minute.
20) Click Extract Previously Downloaded ATAS.
21) Wait about a minute. If the ATAS version information is not refreshed, use the
appropriate browser command to refresh the web page.
22) Inspect the ATAS version information on the ATAS Download page to verify it is
now correct.