User's Manual
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
- 1 Introduction
- 2 Installation Overview and Requirements
- 2.1 Installation Tasks
- 2.2 Requirements for All nano3G APs
- 2.2.1 General Requirements
- 2.2.2 nano3G AP Cooling
- 2.2.3 Information Required for Pre-Provisioning
- 2.2.4 Parameters for Enterprise Deployments
- 2.2.5 Parameters for Residential Deployments
- 2.2.6 Access Control
- 2.2.7 Closed Access with CSG Parameter Broadcast
- 2.2.8 Closed Access in Legacy Mode
- 2.2.9 Pre-Prepared Configurations - Optional
- 2.2.10 Information Required for Commissioning
- 2.2.11 Other Items for Commissioning
- 2.3 nano3G S8 AP Site Requirements
- 2.4 nano3G S16 AP Site Requirements
- 2.5 nano3G E8 AP and nano3G E16 AP Site Requirements
- 3 Pre-Provisioning a nano3G AP
- 4 Configuration File Preparation
- 5 Commission a nano3G AP
- 6 nano3G AP Hardware Installation
- 7 Finalize Installation
- 8 Troubleshooting
- 9 nano3G AP and PSU Regulatory Information
nano3G AP Installation Manual nano3G AP Hardware Installation
N3G_INST_300 v292_1.0 for N3G_2.92 © ip.access Limited 2012 Page 65
2) Insert wall plugs (if required) and secure the screws leaving approximately 3mm
(0.12in) clearance between the screw heads and the wall.
3) Plug the Ethernet cable and the power cable into the AP.
Note: If using the POE splitter when wall mounting the AP, it is recommended to
mount the AP directly on the POE splitter, as in the following section. In
some cases, it may be necessary to mount the AP and the POE splitter on
the wall separately to minimise how far the AP projects from the wall. In
this case, position the POE splitter below the AP where the 100mm
cables will reach the AP.
4) Slide the AP onto the 2 screws.