User's Manual

Table Of Contents
nano3G AP Installation Manual nano3G AP Hardware Installation
N3G_INST_300 v292_1.0 for N3G_2.92 © ip.access Limited 2012 Page 68
6.3.2 Commission the nano3G S16 AP
Configure the AP so that it will connect to its serving NOS Server. If this has not been done
already, do this now, before installing the AP in its final location. For instructions, see
section 5.
6.3.3 Cable Connections
Use one of the cable connection schemes described below, to provide power and the LAN
connection.
Supplied PSU and LAN
When the supplied PSU is used to power the AP, the POE injector and splitter units are not
needed. However, this means that the mains socket providing power to the AP must be
within reach of the cabling included with the supplied PSU (less than 2m).
POE Injector and Splitter
This improves flexibility for locating the AP, as the AP can be up to approximately 100m
from a mains power supply, depending on the placement of the POE Injector.
In this case, the PSU for the AP is not used. The injector takes a direct mains input using
the supplied mains cable.
Supplied
PSU
S8
AP
LAN Cable to
nearest switch/gateway
(max 100m)
Mains
Input
9V DC
cable to AP
Backhaul
Network to AC
Splitter
Injector
S8
AP
POE
Mains Input
9V DC
cable to AP
(100mm)
LAN cable
(100mm)
Backhaul
Network to AC
LAN Cable
to nearest
switch/gateway
Maximum total cable length
between nearest switch/gateway and AP is 100m