Installation Manual

nanoBTS Installation Manual
nanoBTS Hardware Installation
© ip.access Ltd Page 6
Figure 7 - 165 nanoBTS connections
For information about using the Secondary TX location (AUX), see section 2.5.8.
Figure 8 below illustrates the correct cabling of the Ethernet and TIB cables:
Figure 8 - Ethernet and TIB cabling
2.5.3 Ethernet
Each 139/140/178 nanoBTS must be connected to an Ethernet switch or hub via either a
109 ip.access single power inserter or 126 ip.access Powered Ethernet Switch. Refer to
section 5 for details of the power supply connections. The 165 EDGE nanoBTS may use