Commission a nanoBTS
© ip.access Ltd Page 37
2. In the Frequency Band drop-down list, ensure that the correct GSM band is
selected.
3. Click Connect. It will take approximately 90 seconds to create the connection
from BTS Installer to the nanoBTS. When the connection is complete, the
message Ready to run test is displayed in the status pane at the bottom of
the dialog and the Status Indicator on the nanoBTS will flash green.
4. Click Channel Usage on the left side of the dialog. The options on the left side of
the dialog are the Network Listen tests.
5. Click Start Test.
6. When the Channel Usage test is complete, click BCCH Channel Usage.
7. Click Configure Test.
8. Make the required settings in the Configure Test dialog. The BCCH Channel
Usage test reports on channels containing a GSM frequency correction and
synchronisation burst. For more information see [OPM_300].
9. Click Start Test. When the test is complete, the results are displayed in a graph.