Installation Manual

Table Of Contents
CHAPTER 4: PRODUCT INSTALLATION
2003 IPMobileNet, Inc. 30 IPSeries MR User Manual / Rev. A / 08-Apr-03
Post Installation Checklist
Table 9 lists the tasks that should be performed upon completing installation.
TABLE 9: POST INSTALLATION CHECKLIST
NO. CHECKLIST ITEM
1 Scope out the entire vehicle setup to locate any obvious problem areas.
2 Check wiring for safety concerns.
3 Use tie wraps to ensure that all wires routed in parallel are bundled together.
4 Check to see if any wires are exposed.
5
If any wires are exposed, use electrical tape to cover.
When covering wires in the engine compartment, use high-quality
electrical tape.
6
Perform appropriate testing as described in this guide to ensure mobile radio
works properly.
Once installation is completed, remove all debris and restore dismantled parts and rubber mats to
appropriate locations.