SECTION 2: FACTORY TEST PROCEDURE
IP4HPVGPS-MRFCCRpt.doc Page 15
Step 5 Verify the timing characteristics are identical to the plots in the next section, Uplink
Hardware Timing Verification.
Step 6 At the base station monitor PC, verify that all the data quality readings are 240 and higher.
Step 7 Move the scope probes to monitor the timing at the mobile radio as described in Downlink
Hardware Timing Verification. Generate test messages by pinging the IPNC from the PC
attached to the radio. The following command will cause 100 pings, 500 bytes in length to be
transmitted from the mobile radio and echoed by the IPNC through the base station:
.>;Ping 192.168.3.3 -n 100 -l 500 -w 2000
Step 8 Set CRC =1 Enable on the radio
Step 9 Verify the timing characteristics are identical to those in Downlink Hardware Timing
Verification.
Step 10 Verify that both receivers on the mobile radio report data quality readings of 240 or higher
(248 is typical). This can be accomplished by installing the antenna on the TX/RX1 port and
verifying RX1 is selected by observing the RX1 LED on the mobile radio and installing the
antenna on the RX2 port and verifying RX2 is selected by observing the RX2 LED on the
mobile radio.
Step 11 Reset CRC = 0 Disable on the radio
Step 12 In IPMessage, type the ? command to radio. Copy the radio settings and paste them into the
Test Data File.
Step 13 Perform a close visual inspection of the radio closely inspecting manufacturing related
problems (loose screws, solder particles, etc.).