User's Manual

SECTION 4: FACTORY TEST PROCEDURE
M64450G25-FCCRpt.doc Page 40
Message Success Rate Testing and Burn-In
After completion of the alignment and testing, the base station shall undergo Burn In and Final Testing.
Install the mobile radio in the MSR screen room as shown in the figure below.
Sequence Tests
Step 1 In IPMessage, verify latest version of the mobile radio firmware by entering the
‘version’ command.
Step 2 Verify the serial number and MAC I.D. – match the label on the unit by typing
‘serial number’ and ‘radio mac address’.
Step 3 Modify firmware settings as needed and run IPLinkView on the mobile radio on
the highest and lowest frequencies programmed in the mobile radio.
Step 4 Run IPLinkView until a GPS connection is established.
Step 5 Run ‘firmware check’ for the specific Customer.