FITNESS PLAYGROUND ITEM NO: 8010 OWNER’S MANUAL CAUTION: This unit is designed to be used safely by up to 4 children between the ages of 3 years to 8 years old with a maximum weight of 100 pounds (45.4 kgs) each, simultaneously, not to exceed a combined weight of 400 pounds (181.6 kgs). The specifications of this product may vary from this photo and are subject to change without notice. IRONMAN, IRONMAN TRIATHLON and M-DOT are registered trademarks of World Triathlon Corporation.
IMPORTANT: FOR NORTH AMERICA ONLY To request product service and order replacement parts, please call our customer service department at: 1-866-924-1688 Monday through Friday, 8:00 AM-5:00 PM Pacific Standard Time, or email us at: service@paradigmhw.com Please visit our website at www.paradigmhw.com.
TABLE OF CONTENTS Warranty -------------------------------------------------------------------------------------------- 3 Important Safety Precautions ------------------------------------------------------------------ 4 Tools Required for Assembly ------------------------------------------------------------------ 5 Hardware for Assembly ------------------------------------------------------------------------- 6 Parts Numbers and Illustrations ---------------------------------------------------------------
MANUFACTURER’S LIMITED WARRANTY (IRONKIDS FITNESS PLAYGOUND) Paradigm Health & Wellness warrants to the original purchaser that this product is free from defects in material and workmanship when used for the purpose intended, under the conditions that it has be installed and operated in accordance with Paradigm’s Owner’s Manual.
IMPORTANT SAFETY PRECAUTIONS Read all instructions carefully before assembling operating this product. Retain this owner’s manual and keep the original purchase receipt for future reference. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. Before you assemble the Fitness Playground, find level ground not less than 6 feet from any structure or obstruction to the Fitness Playground. Your Fitness Playground must have clearance on all sides.
CARE AND MAINTENANCE Check all nuts and bolts by monthly during the usage season for tightness and tighten as required. It is particularly important that all nuts and bolts are checked prior to the first use each season. TOOLS REQUIRED FOR ASSEMBLY Please prepare the following tools prior to assemble this equipment.
HARDWARE FOR ASSEMBLY Hardware used for main frame assembly (Aa1) Binder Post & Bolt Set (Preassembled) M8x15 Bolt Ø10x52 Sleeve Nut 6 SETS (Aa2) Binder Post & Bolt Set (Preassembled) M6x12 Bolt Ø8x45 Sleeve Nut 6 SETS (Aa3) Binder Post & Bolt Set M6x12 Bolt Ø8x40 Sleeve Nut 8 SETS (Preassembled on the Top Bar and Legs Support) 28 SETS (Packed in the PE Bag) (Aa4) M6x47 Bolt Set (Preassembled) 4 SETS (Aa5) M6x55 Bolt Set (Preassembled) 4 SETS 6
Hardware used for glider assembly (Ba1) Binder Post & Bolt Set (Preassembled) M6x12 Bolt Ø8x73 Sleeve Nut 2 SETS (Ba2) M6x40 Bolt Set (Preassembled) 2 SETS (Ba3) M6x38 Bolt Set (Preassembled) 4 SETS 7
PARTS NUMBERS AND ILLUSTRATIONS Parts used for main frame assembly A1 Top Bar 1 PC A2 Top Bar 1 PC A3 Climber Leg 2 PCS A4 Climber Leg 2 PCS A5 Leg (Two legs are labeled A and B.
A10 Top Bar and Climber Legs Support 2 PCS A11 Top Bar and Legs Support (Two sides are labeled A and B.
Hardware used for main frame assembly Aa1 Binder Post & Bolt Set (Preassembled) M8x15 Bolt Ø10x52 Sleeve Nut 6 SETS Aa2 Binder Post & Bolt Set (Preassembled) M6x12 Bolt Ø8x45 Sleeve Nut 6 SETS Aa3 Binder Post & Bolt Set M6x12 Bolt Ø8x40 Sleeve Nut 8 SETS (Preassembled on the Top Bar and Legs 28 SETS (Packed in the PE Bag) 36 SETS Aa4 Support) M6x47 Bolt Set (Preassembled) 4 SETS Aa5 M6x55 Bolt Set (Preassembled) 4 SETS Aa6 Cap for Top Bar A1 & A2 (Preassembled) 2 PCS Aa7 Cap for Legs (Pr
Parts used for glider assembly B1 Glider Vertical Pole 2 PCS B2 Glider Horizontal Pole 2 PCS B3 Foot Rest 2 PCS B4 Glider Seat 2 PCS B5 Glider Attachment 1 PC B6 Glider Vertical Pole Cap 2 SETS Hardware used for glider assembly Ba1 Binder Post & Bolt Set (Preassembled) M6x12 Bolt Ø8x73 Sleeve Nut 2 SETS Ba2 M6x40 Bolt Set (Preassembled) 2 SETS Ba3 M6x38 Bolt Set (Preassembled) 4 SETS 11
Ba4 Binder Post & Bolt Set (Preassembled) M6x12 Bolt Ø8x40 Sleeve Nut 2 SETS Ba5 Bolt Set M8 Bolt Ø10x30 Sleeve Nut 1 SET Parts used for trapeze assembly T1 Trapeze Tube 1 PC Ta1 Ø10x30 Sleeve Nut Set (Preassembled) 2 SETS Ta2 Eye Bolt Set (Preassembled) 2 SETS Hardware used for trapeze assembly 12
Parts used for swing seats assembly J1 Swing Ring 2 PCS J2 Swing Seat 1 PC Hardware used for swing seats assembly Ja1 Ø10x30 Sleeve Nut Set (Preassembled) 2 SETS Ja2 Eye Bolt Set (Preassembled) 2 SETS Ja3 Screw Hook (Preassembled) 2 PCS Ja4 Screw Hook Cap Set 2 SETS 13
Parts used for shade assembly H1 Sunshade 1 PC H2 Plastic Stick 2 PCS 14
OVERVIEW DRAWING 15
ASSEMBLY INSTRUCTIONS Place the playground equipment on level ground, not less than 6 feet (1.8 meters) from any structure or obstruction such as a fence, garage, house, overhanging branches, laundry lines, or electrical wires. Do not install the playground equipment over concrete, asphalt, packed earth, or any other hard surface. A fall onto a hard surface can result in serious injury to the user.
The Glider Attachment (B5) is preassembled. Step 1 Remove two sets of Aa1 from A1 and A2. Insert the small end of A1 into the socket of A2 and align the holes. Attach A10 onto A1 and A2 with two sets of Aa1 that were removed. ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ Step 2 Climber Legs (A3) Assembly Remove four sets of Aa3 from both A10. Insert both small ends of A3 into the sockets of the A10.
Step 3 Remove four sets of Aa5 from both A5. Attach A12 and A13 onto both A5 with four sets of Aa5 that were removed. Remove four sets of Aa4 from both A4. Attach A12 and A13 onto both A4 with four sets of Aa4 that were removed. Attach twelve A8 onto both A3 and A4 with twenty four sets of Aa3.
A6 Step 4 Insert H2 into the holes on H1. Insert one end of the H2 onto the tube of A13 on A5 and the other end of the H2 onto the tube of A12 on A4. Insert the other H2 onto the tube of A12 on A5 and the other end of the H2 onto the tube of A13 on A4. Attach A14 onto the A6 and both A4 with Velcro straps.
Step 5 Remove one set of Ba2 from B1. Insert the B1into the hole on B3. Align the hole and secure using one set of Ba2 that was removed. Repeat the above same procedure to install the other B1 into B3. ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ Step 6 Remove two sets Ba4 from B5. Install one set of B6 onto the top end of B1. Install B6 with B1 onto B5 and align the holes and secure using one set of Ba4 that was removed.
Step 7 Remove two sets of Ba1 from both B1. Attach both B2 onto both B1 with two sets of Ba1 that were removed.
Step 8 Remove four sets of Ba3 from both B2. Attach both B4 onto both B2 with four sets of Ba3 that were removed. ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ ․ Step 9 Hang J1 in place from Ja2 on the A2.
Step 10 Hang T1 in place from Ta2 on the A2.
GROUND ANCHOR INSTALLATION You may either anchor the feet in hard soil or if your soil is soft (sand, etc.), you may use the corkscrew (A9) anchor to secure the playground. If you wish to permanently secure your swing set, setting the legs in concrete secured by a brick or gravel bed is recommended. Ensure equipment is firmly anchored. When cementing equipment, bury the legs about three inches below the ground. This will ensure sufficient space remains under the swings.
For Concrete Ground Installation: If the swing set is set up on grounds with sandy soil, it must be anchored with concrete footing (concrete not included). Dig holes around swing leg tube as shown below in drawing. As you dig down and create a cylindrical hole, you should use a shovel to carve out the lower part of the hole, to create a larger diameter hole at the bottom. Place 2 inch high brick or 2 inches of gravel bed as shown in drawing below. Use about 45lb of concrete per leg.
IRONKIDS PARTS REQUEST FAX FORM Please fax this form to (1-626-810-2166) OR YOU CAN EMAIL CUSTOMER SERVICE REQUESTS TO service@paradigmhw.