Ground Mount Installation Guide

GROUND MOUNT INSTALLATION MANUAL - 3©
2019 IRONRIDGE, INC. VERSION 2.1
CHECKLIST
IRONRIDGE COMPONENTSPRE-INSTALLATION
Verify module compatibility. See Page 12 for info.
Purchase 2” or 3” ASTM A53 Grade B Schedule 40
Pipe, galvanized to a min of ASTM A653 G90 or ASTM
A123 G35, or 2” or 3” Allied Mechanical Tubing with
Gatorshield or FlowCoat Zinc coating (ASTM A1057).
TOOLS REQUIRED
Post Hole Digger or Powered Auger
Socket Drive (7/16”, 9/16”, and 1/2” Sockets)
Torque Wrenches (0-240 in-lbs and 10-40 ft-lbs)
Transit, String Line, or Laser Level
3/16” Allen Head
TORQUE VALUES
Top Cap Set Screws (3/16” Allen Head)
Schedule 40 Pipe: 20 ft-lbs
2” Allied Mechanical Tubing: 11 ft-lbs
3” Allied Mechanical Tubing: 16 ft-lbs
Top Cap U-Bolt Nuts (9/16” Socket): 15 ft-lbs
Rail Connector Bracket Nuts (9/16” Socket): 21 ft-lbs
Rail Connector U-Bolt Nuts (9/16” Socket): 60 in-lbs
Grounding Lug Nuts (7/16” Socket): 80 in-lbs
Grounding Lug Terminal Screws (7/16 Socket): 20 in-lbs
Universal Fastening Objects (7/16” Socket): 80 in-lbs
Diagonal Brace Set Screws (1/2” Socket): 15 ft-lbs
Diagonal Brace Bolts (1/2” Socket): 40 ft-lbs
Microinverter Kit Nuts (7/16” Socket): 80 in-lbs
Frameless Module Kit Nuts (7/16” Socket): 80 in-lbs
Þ If using previous version of: Integrated Grounding Mid Clamps,
Grounding Lug, End Clamps, and Expansion Joints please refer to
Alternate Components Addendum (Version 1.20).
Þ If installing on a low slope roof please refer to Ground Mount for
Flat Roof Applications Addendum (Version 1.80).
XR100 & XR1000 Rail Rail Connector
Top Cap UFO
Diagonal Brace
Stopper Sleeve
Grounding Lug Microinverter Kit
Frameless Module Kit Frameless End/Mid Clamp
CAMO
End Cap Wire Clip