Installation Guide

BX SYSTEM INSTALLATION MANUAL - 8©
2019 IRONRIDGE, INC. VERSION 1.1
6. INSTALL MODULES
A. PLACE CLAMPS
Place Bottom Clamp over the Chassis' corner bolt, then
pull clamp towards the outer edge.
í The north end of the North Row and south end of the South Row
do not need bottom clamps.
B. LAY MODULES
Starting in the South-West corner and working east, lay
modules in a row onto edge of Bottom Clamps. Double-
check panel spacing along each row.
í You can use reference tabs located in the middle of the Chassis to
properly space modules.
C. SECURE MODULES
To secure a module, rst pull the Bottom Clamp until it is
snug against the inner ange of the module. Then place
the Top Clamp and Flange Nut over the bolt and torque to
120 in-lbs.
A. MODULE-TO-MODULE BONDING
The 8” Bonding Jumper is an electrial bonding jumper that
can be used for module to module bonding.
í New jumpers should be used if re-installation of jumper is
required.
í Jumpers are installed on the bottom ange of modules.
í Supports ange thicknesses 1.2mm to 3.1mm.
7. COMPLETE BONDING
A
A
B
C
Reference Tab Properly Gaps Modules
Lay Module onto
Bottom Clamps
120 in-lbs