Manual
Table Of Contents
©
2021 IRONRIDGE, INC. VERSION 3.1 FLUSH MOUNT INSTALLATION MANUAL - 10
COMPOSITION SHINGLE
Locate roof rafters and mark locations on roof. Drill 1/4" 
pilot holes perpendicular to the roof and back ll with 
roong manufacturers' approved sealant. Slide ashing 
between 1st and 2nd course of shingles, ensuring both 
that the ashing reaches under the 3rd shingle course and 
doesn't overhang the downhill shingle course. Line up with 
pilot hole and insert supplied lag bolt with washer through 
ashing. With a 7/16" Socket fully seat lag bolt. Place Cap 
onto ashing in desired orientation for E/W or N/S rails and 
rotate 180 degrees until it locks into place.
 ➢ Rail can be installed on either side of FlashFoot2 Cap.
 ➢ For additional details refer to the full FlashFoot2 Installation 
Manual. 
FLASHFOOT2
FLASHVUE
Locate rafters and snap vertical and horizontal lines to 
mark locations of ashings. Drill 1/4” pilot holes, then 
backll with an approved sealant. Slide ashing between 
1st and 2nd course of shingles, ensuring both that the 
ashing reaches under the 3rd shingle course and doesn't 
overhang the downhill shingle course. Line up pilot hole 
with View Port. Press Grip Cap onto ashing in desired 
orientation for E/W or N/S rails. Insert Lag Bolt with 
mechanically bonded washer through ashing. With a 
7/16" Socket drive Lag Bolt until fully seated. FlashVue 
is now installed and ready for IronRidge XR Rails. 
Attach rails to either side of the open slot using bonding 
hardware. Level rail at desired height, then torque to 250 
in-lbs (21 ft-lbs).
When installing Gripcap+ on roofs with undulations greater
than 1 inch, install GripCap+ in low points across the array 
as required.
 ➢ For additional details refer to the full FlashVue Installation 
Manual. 
 ➢ For additional details on the GripCap+ refer to the full GripCap+ 
Installation Manual. 
Torque to 
250 in-lbs










