FX Rail-Less Engineering
FX Engineering & Design Guide
IRONRIDGE CONFIDENTIAL
Page 12 of 21
3.5 Bridge Placement
Bridges are placed at all East-West module junctions.
Similar to the method used for placing Mounts, start with the first row of modules, work your way
left to right across the row, and then up the roof until all Bridges have been placed. Note that
co-locating Mounts and Bridges is OK.
3.5.1 Bridge Placement Check
1. Verify that each Bridge is located between (2) Mounts.










