Manual

Insert Tile Replacement Flashing, lower onto base
and apply pressure over the threaded post until it
dimples the ashing.
Place L-Foot over top of dimple and tap with hammer
to punch the threaded posted through the ashing.
Ensure punched pieces of ashing are cleared away.
© 2019 IronRidge, Inc. All rights reserved. Visit www.ironridge.com or call 1-800-227-9523 for more information. KOB-01-MAN REV 1.10
Installation
Tools Required: Tape measure, chalk, approved sealant, hammer, and driver with 1/4” bit and 1/2” hex socket
1
Remove tile and mark rafter. Use base as guide to
drill 1/4” pilot hole and ll with roong manufacturer’s
approved sealant.
Structural Certication
Designed and Certied for Compliance with the International Building Code & ASCE/SEI-7.
Water Seal Ratings
Water Sealing Tested to UL 441 Section 27 “Rain Test” and TAS 100(A)-95 “Wind Driven Rain Test” by Intertek. Ratings applicable for concrete
tile roofs having slopes between 2:12 and 12:12. Tested and evaluated without sealant. Any roong manufacturer approved sealant is allowed.
UL 2703
Conforms to UL 2703 Mechanical and Bonding Requirements. See IronRidge Flush Mount Installation Manual for full ratings.
Insert lag with bonded washer through base into
pilot hole and fully seat. Base can be installed in
either orientation shown. Seal or ash base as
needed. If deck level ashing is required, approved
ashing methods include user-supplied, adhesive-
backed, exible ashing.
Form ashing as needed to sit ush with surrounding
tiles. Position L-Foot in desired orientation and torque
hardware to 132 in-lbs (11 ft-lbs).
Attach rail to either side of L-Foot with bonding
hardware. Ensure L-Foot does not extend above rail.
Torque hardware to 250 in-lbs (21 ft-lbs).
2
3 4
5 6
Rafter
Dimple
Tap With
Hammer
Torque to 132 in-lbs
Torque to
250 in-lbs
Tighten Until
Fully Seated