Installation Guide

GROUND MOUNT INSTALLATION MANUAL - 4©
2015 IRONRIDGE, INC. VERSION 2.23
3. PLACE RAILS
A. ATTACH HARDWARE
On ground, attach Rail Connector bracket to rail by sliding
3/8”-16 bolts into side slot. Space out to match pier
spacing. With bracket in place, nger tighten ange nuts
onto bolts. Repeat for remaining Rail Connectors.
If using Mid Clamps with hex bolts, slide provided 1/4”-20 bolts
into top slot of rails at this time. Space bolts for panel spacing.
Tape ends of rail, to keep bolts from sliding out while moving.
B. FASTEN CONNECTORS
Center rails on cross pipes, leaving equal distance on
ends. Secure with Rail Connector hardware: 3/8”-16
U-bolts, ange nuts, at washers, and lock washers.
Torque U-bolt to 60 in-lbs and bracket to 204 in-lbs.
Spacing between rails should align with module mounting holes.
WEEB LUGS
Review Wiley WEEB Installation Instructions, using 6-10
AWG (minimum) solid copper grounding wire. Torque hex
nut to 120 in-lbs and set screw to 84 in-lbs.
4. SECURE LUGS
A
B
U-Bolt
(60 in-lbs)
Bracket
(204 in-lbs)
Hex Nut
(120 in-lbs)
Set Screw
(84 in-lbs)