Installation Guide
GROUND MOUNT INSTALLATION MANUAL - 4©
2015 IRONRIDGE, INC. VERSION 2.23
3. PLACE RAILS
A. ATTACH HARDWARE
On ground, attach Rail Connector bracket to rail by sliding
3/8”-16 bolts into side slot. Space out to match pier
spacing. With bracket in place, nger tighten ange nuts
onto bolts. Repeat for remaining Rail Connectors.
☑ If using Mid Clamps with hex bolts, slide provided 1/4”-20 bolts
into top slot of rails at this time. Space bolts for panel spacing.
☑ Tape ends of rail, to keep bolts from sliding out while moving.
B. FASTEN CONNECTORS
Center rails on cross pipes, leaving equal distance on
ends. Secure with Rail Connector hardware: 3/8”-16
U-bolts, ange nuts, at washers, and lock washers.
Torque U-bolt to 60 in-lbs and bracket to 204 in-lbs.
☑ Spacing between rails should align with module mounting holes.
WEEB LUGS
Review Wiley WEEB Installation Instructions, using 6-10
AWG (minimum) solid copper grounding wire. Torque hex
nut to 120 in-lbs and set screw to 84 in-lbs.
4. SECURE LUGS
A
B
U-Bolt
(60 in-lbs)
Bracket
(204 in-lbs)
Hex Nut
(120 in-lbs)
Set Screw
(84 in-lbs)