Installation Guide

GROUND MOUNT INSTALLATION MANUAL - 6©
2015 IRONRIDGE, INC. VERSION 2.23
DIAGONAL BRACES (OPTIONAL)
Slide sleeve on north pier, 2-3” above the ground. Attach
Diagonal Brace to sleeve with 1/2” hardware. Slide second
sleeve on south pier, raising Diagonal Brace to align holes
in sleeve and brace. Attach hardware and raise sleeve to
full extent. Torque Diagonal Brace assembly to 480 in-lbs.
UNDER CLAMPS (OPTIONAL)
Slide Under Clamp into side rail slot. Line up Under Clamp
with module mounting holes and attach with hardware.
Torque hardware to 120 in-lbs.
END CAPS (OPTIONAL)
WIRE CLIPS (OPTIONAL)
End Caps add a completed look and keep debris and
pests from collecting inside rail.
Firmly press End Cap onto rail end.
Wire Clips offer a simple wire management solution.
Firmly press Wire Clip into top rail slot. Open clip and
insert electrical wire accordingly. Close clip once complete.
South Pier North Pier
Diagonal Brace
Sleeve
Torque Hardware
to 480 in-lbs
Torque to
120 in-lbs