Installation Guide

FLUSH MOUNT INSTALLATION MANUAL - 7©
2016 IRONRIDGE, INC. VERSION 1.10
FLASHFOOT
Locate roof rafters and mark locations on roof. Drill 1/4”
pilot holes and backll with approved sealant. Slide
ashing between 1st and 2nd course of shingles ensuring
ashing doesn't overhang the downhill shingle. Line up
pilot hole and insert supplied 5/16 x 4.5" stainless steel lag
bolt through washer, L-Foot, and ashing. Fully seat lag
bolt.
í L-Foot can face either upslope or downslope on roof.
End Caps add a completed look and keep debris and
pests from collecting inside rail.
Firmly press End Cap onto rail end.
í End Caps come in sets of left and right. Check that the proper
amount of each has been provided.
WIRE CLIPS
Wire Clips offer a simple wire management solution.
Firmly press Wire Clip into top rail slot. Run electrical wire
through open clip. Snap closed once all wires have been
placed.
Press Clip
into Slot
Run Wire
Snap Clip
Closed
END CAPS
Attach Standoffs to roof locations with lag bolts (not
included). Place ashing over Standoff. Attach L-Foot on
Standoff washer with hardware. Torque to 140 in-lbs.
Torque to
140 in-lbs
FLUSH STANDOFFS
Flashing
Provided by
Others