3. PLACE RAILS
4. SECURE LUGS
A. CONNECT SPLICES
Use Bonded Splices, when needed, to join multiple
sections of rail. Insert Bonded Splice 6" into rst rail and
secure with two self-drilling screws, spacing them about
1” apart and torquing to 20 in-lbs. Slide second rail over
Bonded Splice and secure with two self-drilling screws.
í Rows exceeding 100 feet of rail must use Expansion Joints.
í For XR10 and XR100 rails, insert screws along the provided lines.
í Refer to Structural Certication letters for rail splice location
requirements.
í Screws can be inserted on front or back of rails.
í If using Bonding Bolt Splices, refer to addendum (v1.0).
B. ATTACH SOUTH RAILS
Slide 1" long bonding bolt into side-facing rail slot. Mount
rail to pivot bracket of South Legs and loosely tighten nuts.
C. ATTACH NORTH RAILS
Slide 2.25" bonding bolt into side-facing rail slot. Mount rail
to top of North Legs. Tighten all 3/8” hardware to 250 in-
lbs once rails are square.
í Use a straight edge to ensure South and North rails are on the
same plane. An extra section of rail works well.
í Rails can mount on either north or south side of North Tilt Leg.
B
C
A
Torque to
20 in-lbs
6" Inside Rail
1"
Torque All
Hardware
250 in-lbs
Use Straightedge
to Square Rails
Insert T-bolt in top rail slot and torque hex nut to 80 in-
lbs. Install a minimum 10 AWG solid copper or stranded
grounding wire. Torque terminal screw to 20 in-lbs.
í Grounding Lugs are only needed on one rail per row of modules.
í If using Enphase microinverters, Grounding Lugs may not be
needed. See Page 9 for more information.
í Grounding Lugs can be installed anywhere along the rail and in
either orientation shown.
Hex Nut
(84 in-lbs)
Terminal Screw
(20 in-lbs)
Hex Nut