Workshop Manual

6E–209
6VE1 3.5L ENGINE DRIVEABILITY AND EMISSIONS
DTC P0155 – HO2S Heater Circuit Open Bank 2 Sensor 1 (Cont'd)
Step NoYesValue(s)Action
6 1. Allow the HO2S to cool for at least 15 minutes.
2. Using a DVM, measure resistance between the
Bank 2 HO2S 1 ignition feed and the Bank 2 HO2S 1
heater ground at the Bank 2 HO2S 1 pigtail.
Is the HO2S resistance within the specified values?
3-6 ohms Go to
Step 9
Go to
Step 10
7 Repair the open Bank 2 HO2S 1 ignition feed circuit to
Bank 2 HO2S 1.
Is the action complete?
Verify repair
8 Repair the open Bank 2 HO2S 1 heater ground circuit.
Is the action complete?
Verify repair
9 1. Check for a poor connection at the Bank 2 HO2S 1
harness terminals.
2. If a poor connection is found, replace terminals.
Was a poor connection found?
Verify repair Go to
Step 10
10 Check for a poor Bank 2 HO2S 1 signal or low circuit
terminal connection at the Bank 2 HO2S 1 harness
connector and replace terminal(s) if necessary.
Did any terminals require replacement?
Verify repair Go to
Step 11
11 1. Ignition “OFF”.
2. Disconnect the PCM and check the continuity of the
Bank 2 HO2S 1 signal circuit and the Bank 2 HO2S
1 low circuit.
3. If the Bank 2 HO2S 1 signal circuit or HO2S low
circuit measures over 5 ohms, repair open or poor
connection as necessary.
Was a problem found?
Verify repair Go to
Step 12
12 Check for a poor Bank 2 HO2S 1 low circuit terminal
connection at the PCM and replace the terminal if
necessary.
Did the terminal require replacement?
Verify repair Go to
Step 13
13 Check for a poor Bank 2 HO2S 1 signal circuit terminal
connection at the PCM and replace the terminal if
necessary.
Did the terminal require replacement?
Verify repair Go to
Step 14
14 Replace Bank 2 HO2S 1.
Is the action complete?
Verify repair
15 Locate and repair short to ground in Bank 2 HO2S 1
ignition feed circuit and replace the faulty fuse.
Is the action complete?
Verify repair