Workshop Manual
6E–218
6VE1 3.5L ENGINE DRIVEABILITY AND EMISSIONS
DTC P0160 – HO2S Circuit Insufficient Activity Bank 2 Sensor 2 (Cont'd)
Step NoYesValue(s)Action
7 1. Ignition “OFF”.
2. With the PCM disconnected, check continuity of the
Bank 2 HO2S 2 high circuit.
3. If the Bank 2 HO2S 2 high circuit measures over 5.0
ohms, repair open or poor connections as
necessary.
Was a Bank 2 HO2S 2 high circuit problem found and
corrected?
— Verify repair Go to
Step 8
8 1. Ignition “OFF”.
2. With the PCM disconnected, check continuity of the
Bank 2 HO2S 2 low circuit.
3. If the Bank 2 HO2S 2 low circuit measures over 5
ohms, repair open or poor connections as
necessary.
Was a Bank 2 HO2S 2 low circuit problem found and
corrected?
— Verify repair Go to
Step 9
9 1. Ignition “ON”, engine “OFF”.
2. Disconnect Bank 2 HO2S 2 and jumper the HO2S
high and low circuits (PCM side) to ground.
3. Using a Tech 2, monitor Bank 2 HO2S 2 voltage.
Is Bank 2 HO2S 2 voltage in the specified range?
0-10 mV Go to
Step 10
Go to
Step 11
10 Replace Bank 2 HO2S 2.
Is the action complete?
— Verify repair —
11 Replace the PCM.
IMPORTANT: The replacement PCM must be
programmed. Refer to
On-Vehicle Service
in
Powertrain Control Module and Sensors
for
procedures.
And also refer to the latest Service Bulletin.
Check to see if the Latest software is released or not.
And then Down Load the LATEST PROGRAMMED
SOFTWARE to the replacement PCM.
Is the action complete?
— Verify repair —