Workshop Manual

5A–14
BRAKE CONTROL SYSTEM
Getting Started
B Before operating the Isuzu PCMCIA card with the
Tech 2, the following steps must be performed:
1.The Isuzu 98 System PCMCIA card (1) inserts into
the Tech 2 (4).
2.Connect the SAE 16/19 adapter (2) to the DLC cable
(3).
3.Connect the DLC cable to the Tech 2 (4).
4.Make sure the vehicle ignition is off.
5.Connect the Tech 2 SAE 16/19 adapter to the vehicle
DLC.
826R200011
6.The vehicle ignition turns on.
7.Power up the Tech 2.
8.Verify the Tech 2 power up display.
060RW009
Operating Procedure
The power up screen is displayed when you power up the
tester with the Isuzu systems PCMCIA card. Follow the
operating procedure below.
060R100102