Workshop Manual
6D3–19
STARTING AND CHARGING SYSTEM (6VE1 3.5L)
Installation
1.Install generator assembly to the position.
2.Install generator assembly and tighten the fixing bolts
to the specified torque.
Torque:
M10 bolt: 41 N·m (30 Ib ft)
M8 bolt: 21 N·m (15 Ib ft)
3.Connect wiring harness connector and direct terminal
“B”.
4.Move drive belt tensioner to loose side using wrench,
then install drive belt to normal position.
5.Reconnect battery ground cable.
Disassembled View
066RW022
Legend
(1) Pulley Nut
(2) Pulley
(3) Front Cover Assembly
(4) Rotor Assembly
(5) Stator Assembly
(6) Through Bolt
(7) Nut
(8) Terminal Insulator
(9) Rear Cover Assembly
(10) Rectifier
(11) Brush Holder Assembly
(12) Regulator Assembly