User's Manual

Installing the 100G ERT Module
To Attach the Endpoint to the Meter
1. Turn the white wriggler so one of its four drive slots lines up with the drive dog.
2. Gently place the 100G ERT Module on the meter.
If there is a gap between the gasket and the meter, it is probably because the drive slot
of the ERT module assembly's wriggler is not properly aligned with the meter
wriggler drive dog. To correct this, remove the assembly and repeat the alignment
procedure in step one.
3. Turn each screw 1/4 to 1/2 turn after it contacts the cover.
IMPORTANT Meter manufacturers should torque the mounting screws 15 to 20
inch-pounds.
Natural Gas Solutions 100G Installation Guide 49