User's Manual

This chapter provides the instructions to install the ERT module on a Sensus meter. These instructions apply
to 11-tooth, 16-tooth, and 18-tooth Sensus 100G ERT modules.
Note Sensus meters are also known as Invensys, Equimeter, or Rockwell. For these instructions, all
meter types are referred to as Sensus meters.
100G series gas ERT module
Sensus 11-tooth
Sensus 16-tooth
Sensus 18-tooth
Removing the Meter Index
Begin the module installation by removing the index cover and index from the meter.
To remove the index from the meter
1. Remove the four index cover screws and the index cover from the Sensus meter. Alternate screw removal
following the numbered pattern as shown in the following photo.
2. Examine the mounting screws. If they are 5/8-inch long and not corroded, keep them to attach the 100G
series gas ERT module assembly. If the screws are not the correct length or if the screws are corroded,
discard them.
Note You may use the removed index cover as a temporary storage container for screws. Properly
dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not
leave materials on the customer premises.
S
ensus Meter Installation
TDC-0823-014 100G Series Gas ERT Module Installation Guide, Direct Mount 24
Proprietary and Confidential