User's Manual

Itron Meter Installation
3. Place a new tamper seal over the two screws in the tamper seal cups. Press the new tamper seals into place
using an 11/32-inch nut driver or similar blunt tool.
4. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
customer premises.
100G installation on the Sprague 175RM meter is complete.
TDC-0823-014 100G Series Gas ERT Module Installation Guide, Direct Mount 48
Proprietary and Confidential