User's Manual Part 2

100G Datalogging Installation Guide - Direct Mount 31
This chapter provides instructions to install the 100G Datalogging Gas Endpoint on an
Itron/Actaris Meter.
Note Itron/Actaris meters are also known as Sprague and Schlumberger meters.
For these instructions, all meters will be referred to as Itron/Actaris meters.
To remove the index from the meter
1. Remove the index cover screws and the index cover from the Itron/Actaris meter.
Examine the mounting screws. If they are 5/8" long and not corroded, keep them to re-
attach the 100G Datalogging Gas Endpoint assembly. If the screws are not the correct
length or if the screws are corroded, discard.
Note Use the removed index cover as a temporary storage container for
screws. Properly dispose all unused screws, old index covers, gaskets, tamper
seals, and other leftover materials. Do not leave materials on customer premises.
C
HAPTER
4
Itron/Actaris Meter Installation