User's Manual Part 2

Programming the 100G Datalogging Gas Endpoint Assembly
100G Datalogging Installation Guide - Direct Mount 35
Take note of the index drive rate shown on the drive dial on the index. The endpoint is
programmed based on the drive rate. Itron/Actaris meter index drive rates are typically 2-
cubic feet.
To program the 100G Datalogging Gas Endpoint
1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the
FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR
as close to vertical as possible. For best success, keep the FC200SR within 6 feet of
the target endpoint. Verify you have the correct programming mode (Fixed Network
Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your
application. Programming parameters are based on the mode defined by your system
administrator.
During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100
cubic feet; the last two digits (tens and units) are programmed as zeros (0). After
programming is complete, the endpoint assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly after assembly.
Caution Do not turn the drive wriggler faster than one turn per second.