User's Manual Part 2

Chapter 4 Itron/Actaris Meter Installation
36 100G Datalogging Installation Guide - Direct Mount
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
Attaching the 100G Datalogging Gas Endpoint Assembly to
the Itron/Actaris Meter
After the 100G Datalogging Gas Endpoint has been programmed, attach it to the
Itron/Actaris meter.
To attach the 100G Datalogging Gas Endpoint
1. Align the white wriggler (1) so one of its four drive slots lines up with the meter's
drive dog (2).
2. Carefully place the 100G Datalogging Gas Endpoint on the meter.
Warning Failure to correctly align the meter drive post and endpoint drive slot
can cause binding and lead to poor registration or meter failure. If there is a gap
between the endpoint gasket and the meter, it may be the drive slot of the
endpoint assembly's wriggler is not correctly aligned with the meter drive slot.
Remove the 100G Datalogging Gas Endpoint assembly and repeat the
alignment procedure. You must establish proper engagement of the meter drive
dog within the endpoint wriggler slot.