User's Manual Part 2

Attaching the 100
G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter
100G Datalogging Installation Guide - Direct Mount 49
To Assemble the 100G Datalogging Gas Endpoint and Index
1. Separate the 100G Datalogging Gas Endpoint housing from the cover by pulling the
cover straight out from the housing.
2. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or
snow. The cover will be used later in this installation procedure.