User's Manual Part 2

Programming the 100G Datalogging Gas Endpoint Assembly
100G Datalogging Installation Guide - Direct Mount 25
5. Slide the endpoint cover over the index and housing. Verify the cover is installed
correctly. The endpoint label should be clearly visible and easily read.
Programming the 100G Datalogging Gas Endpoint Assembly
The 100G Datalogging Gas Endpoint must be programmed with the FC200SR
handheld computer loaded with EndPoint-Link
®
or Point-Link Pro
®
software version
5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information.
Caution The 100G Datalogging Gas Endpoint must be programmed before use.
Follow the steps in this section to properly program the endpoint.