User's Manual Part 3

Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
100G Datalogging Installation Guide - Direct Mount 67
Installing the 100G Datalogging Commercial Gas Endpoint on
an Itron/Actaris Commercial Meter
This section provides instructions for installing the 100G Datalogging Commercial Gas
Endpoint on Itron/Actaris 675A, 800A, and 1000A commercial meters. Installation requires
an Itron/Actaris adapter kit from Itron/Actaris.
Itron/Actaris Adapter Kit (Part Number 80005901-01)
Adapter plate
Endpoint mounting screws (4)
Screw bushings (4)
Tamper seals
Extension driver
Before You Begin
Follow To Remove the Index/Index Assembly from the Meter on page 57 to prepare the
Itron-Actaris meter for installation. Program the Commercial 100G Datalogging Gas
Endpoint (see Programming the 100G Datalogging Gas Endpoint Assembly on page 60)
prior to installation.